Medha has designed, manufactured, and integrated the complete battery-electric powertrain kit, including battery storage and management units, for 9 new Greenco intercity coaches as part of a 100 bus contract. With 91 buses currently under construction, the initial 9 buses have already been successfully placed into operation.

Electric Powertrain: Permanent Magnet Synchronous Motor
Inverter: Motor control unit
Vehicle Control Unit
Onboard diagnostics unit​: for remote monitoring and diagnostics
Battery Management System​: for management of battery functions and Battery Thermal Management
Auxiliary system (inverters, DC-DC converter)​
Battery pack: LFP battery pack
9 Battery Electric Coaches are already in operation. 91 coaches are currently under production.​
Medha has designed and manufactured the whole suite of solution inhouse, and integrated it into the bus body

Medha Zero-Emission Solutions: Driving the World Toward a Greener, Sustainable Future

Play Video about Greenco electric Buses

More Battery Electric Bus case studies.

Related Medha Products.